Browse all practice questions for the AACE Planning & Scheduling Professional (PSP) Certification Practice Exam. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

Ace the AACE PSP Certification 2026 – Master Your Planning & Scheduling Power! course image
All questions

These questions are part of the practice quiz. Start practicing

  • What factors contribute to determining planning duration?
  • What can be inferred about activities on a near-critical path?
  • Which planning document is primarily focused on outlining time sequencing?
  • What is meant by a constrained resource in project management?
  • Why is MIP 3.4 regarded as widely accepted in project management?
  • Why is it important to document project assumptions?
  • What is baseline variance in project management?
  • How is resource-constrained scheduling defined?
  • Which of the following represents the four relationship types in a logic diagram?
  • How is schedule variance (SV) calculated?
  • What is the main output of the planning phase?
  • What is the Critical Path in project management?
  • What are early finish and late finish in project scheduling?
  • What is a project constraint?
  • What is rolling wave planning?
  • How can the quality of a project schedule be effectively measured?
  • What concept does the phrase 'float' refer to in project scheduling?
  • What key analytical method does MIP 3.4 employ?
  • What does the acronym OBS stand for?
  • How might the concept of a "driving relationship" affect project scheduling?
  • What type of analysis is MIP 3.5 recognized for?
  • What does the Performance Measurement Baseline (PMB) include?
  • What is meant by "near-critical" path in project scheduling?
  • What does BAC (Budget at Completion) refer to in project management?
  • What does a schedule compliance review assess?
  • Why is having a Performance Measurement Baseline important?
  • What is a lag in scheduling?
  • What is the aim of MIP 3.1 in project analysis?
  • What role does contemporaneous documentation play during the delay analysis process?
  • What does ETC stand for in project management?
  • What is the definition of management reserve?
  • What type of delays does a contractor experience during concurrent delays?
  • What structure should a PSP memo follow?
  • What does the term data date refer to?
  • What does scope-schedule-cost integration involve?
  • What is the primary purpose of the organizational breakdown structure (OBS) in cost control?
  • What is an essential element of Time Impact Analysis?
  • What does early start (ES) refer to in scheduling?
  • What does a CPI value of less than 1.0 indicate?
  • What characterizes a non-excusable delay?
  • What is the purpose of a change impact fragnet in scheduling?
  • Which component defines the project's objectives clearly?
  • Which of the following best describes the critical path in project scheduling?
  • What is one benefit of modeled analysis in project scheduling?
  • Which document aligns scope, schedule, and cost?
  • What is the primary focus of a scheduling tool?
  • What is the fundamental purpose of a schedule update report?
  • What is a logic tie in project scheduling?
  • What is the purpose of stakeholder analysis?
  • What’s the impact of mandatory finish constraints?
  • What is meant by "establishing project goals"?
  • What is a logic loop in the context of scheduling?
  • What is float ownership in project management?
  • Which of the following are typical Earned Value Management (EVM) data elements?
  • What is a milestone?
  • Which term describes the budgeted value of work scheduled to be performed?
  • What does Earned Value (EV) represent?
  • What is a recovery schedule?
  • What are project variables?
  • What is late start (LS) in project management?
  • What is parametric estimating?
  • What is a risk register?
  • What role does the assumptions log play in project planning?
  • Which of the following best describes the concept of a schedule?
  • What are critical planning documents used for in project management?
  • What is the main cause of float erosion?
  • What is a planning package?
  • What is the significance of logic in project scheduling?
  • Which of the following best describes statused scheduling techniques?
  • What defines a "deliverable" in project management?
  • What does a phase relationship denote in project management?
  • What is typically required for baseline submittal?
  • How are schedule levels 1-4 categorized?
  • Which scheduling technique helps to identify the duration of project tasks?
  • How does delay analysis influence entitlement in project management?
  • What defines a prospective analysis in project scheduling?
  • What does risk exposure measure in project management?
  • What are open ends in project scheduling?
  • What is a recovery plan?
  • What defines a "driving relationship" in the context of project scheduling?
  • What does float ownership refer to in project scheduling?
  • What is a planning product?
  • What does EAC stand for?
  • Using which measurement can you determine whether a project is delayed relative to its schedule?
  • Which of the following describes the three dimensions of classification in project scheduling?
  • What does a backward pass in scheduling calculate?
  • When is MIP 3.3 commonly utilized?
  • Which term is defined as a constrained resource that drives scheduling?
  • What does Total Float indicate in a project schedule?
  • Under what conditions is MIP 3.6 preferred for use?
  • What does logic density measure in a project schedule?
  • What outcome should a planner aim for when updating a schedule?
  • What does the 'prospective modeled method' primarily involve?
  • What does the term 'data date' refer to in schedule analysis?
  • What is the purpose of resource leveling in project management?
  • What does WBS stand for?
  • What is the burden of proof in delay claims?
  • What characterizes a deterministic schedule?
  • What is the primary goal of schedule development?
  • What is one reason for conducting a delay analysis?
  • What is the main concept of MIP 3.2?
  • Which of the following is considered the most common logic error in scheduling?
  • What does a deterministic schedule usually fail to consider?
  • What method does MIP 3.3 use to analyze delays?
  • What is the primary purpose of a fragnet in forensic analysis?
  • Who is responsible for approving the baseline plan in a project?
  • What is typically modeled using a fragnet?
  • Which of the following is NOT a component of Earned Value Management?
  • Which of the following best describes a monitoring schedule?
  • In project scheduling, what is a retrospective analysis?
  • What defines a hammock activity in a project schedule?
  • What is the primary function of the windows analysis method?
  • What does activity splitting refer to in project management?
  • What is the primary purpose of updates in project scheduling?
  • What does a modeled method aim to achieve in forensic analysis?
  • How is the Schedule Performance Index (SPI) calculated?
  • What are key planning outputs in project management?
  • What is the purpose of a project charter?
  • What is the main goal of the PSP memo?
  • How is an excusable delay defined in project management?
  • What are Method Implementation Protocols (MIPs)?
  • How is VAC (Variance at Completion) calculated?
  • What does a constraint override mean in project scheduling?
  • What is scope creep?
  • Which MIPs are considered most defensible when the schedule logic is poor?
  • What is meant by negative float in project scheduling?
  • What does CBS stand for?
  • What does MIP 3.1 primarily focus on?
  • In project scheduling, what does float represent?
  • Which analysis method uses schedule simulation to analyze impacts?
  • Which of the following is considered a main planning risk?
  • Which of the following is NOT a characteristic of observational methods?
  • What does the Code of Accounts help with in project management?
  • What is a resource calendar in project scheduling?
  • What is defined as the actual start date of an activity?
  • When is MIP 3.1 most suitable for usage?
  • What is a key ethical duty of a PSP?
  • What is the purpose of an S-curve in project management?
  • What does it imply if a delay is categorized as excusable?
  • What is the first step in the process of schedule creation?
  • Why is timely documentation important in project management?
  • What are planning considerations?
  • In delay claims, what aspect is critical for supporting arguments?
  • What does a "fragnet insertion" involve in project scheduling?
  • What is a baseline schedule used for?
  • What does variance analysis in schedule maintenance indicate?
  • When is constructability input considered most effective?
  • Which of the following statements is true about project baselines?
  • What is a planning assumption?
  • What is a fragnet in the context of scheduling?
  • What distinguishes WBS from OBS?
  • What is computed during a forward pass in scheduling?
  • What tone should the PSP memo use?
  • What is phase definition in project management?
  • What is constructability review?
  • What does MIP 3.6 primarily compare in schedule updates?
  • In the context of project management, if a project has a CPI of 0.85, what does this signify?
  • What is the purpose of the TIA method in project scheduling?
  • What does excessive float in a schedule usually indicate?
  • What is a linear schedule commonly used for?
  • In which situation would a pacing delay likely occur?
  • What role does earned value analysis play in project management?
  • What is the key difference between lag and lead time in scheduling?
  • What does contemporaneous documentation refer to?
  • What does a P90 forecast indicate?
  • What does contemporaneous documentation refer to?
  • Which scenario describes a pacing delay?
  • What does a Schedule Narrative encompass in project scheduling?
  • What limitation is associated with MIP 3.2?
  • What distinguishes CPM from PERT in project scheduling?
  • What type of analysis does MIP 3.4 represent?
  • What does CPM stand for in project management?
  • Why is it important to adjust a schedule regularly?
  • When is retrospective analysis generally preferred over prospective methods?
  • What is a risk-adjusted schedule?
  • What is the definition of Free Float?
  • What does the cost of poor planning generally result in?
  • What is the goal of value engineering?
  • Which of the following is NOT one of the three dimensions classified in 29R-03?
  • Which three elements are identified as primary project constraints?
  • How does a probabilistic schedule differ from a deterministic schedule?
  • What does resource smoothing entail?
  • Which analysis focuses on analyzing future project impacts during execution?
  • How does a risk-adjusted schedule help in project management?
  • What is a stakeholder review?
  • What is the critical path index (CPI) used for?
  • What does adding buffer time to a project schedule typically achieve?
  • What implication does an SPI value of less than 1.0 have?
  • What is one key benefit of using a Work Breakdown Structure (WBS)?
  • Which MIPs do not require the insertion or removal of fragnets?
  • What does resource leveling accomplish in project scheduling?
  • What is meant by float path?
  • Which of the following best describes the usage of an S-curve?
  • Which value represents the forecasted cost to complete the remaining work?
  • What is the purpose of the schedule basis document in project management?
  • Which document details the hierarchy of project scope?
  • What does qualitative risk analysis involve?
  • In project management, what does the term "stakeholder" refer to?
  • What is a periodic forecast?
  • What does lead time refer to?
  • What is the purpose of a schedule review checklist?
  • What does the term 'Milestone' refer to in project scheduling?
  • What does an early finish date represent in project scheduling?
  • What defines a work calendar in project management?
  • What tool defines stakeholder responsibilities?
  • What key aspect defines a successful retrospective analysis?
  • What is a key benefit of stakeholder alignment in planning?
  • What is meant by concurrent delay?
  • What does Actual Cost (AC) refer to?
  • What is the first input to planning?
  • In the context of MIP analysis, what is the significance of having sound logic?
  • Why is earned value used in scheduling?
  • Why might MIPs 3.2 and 3.6 be specifically chosen during poor schedule logic situations?
  • What does the collapsed as-built method aim to achieve?
  • What is a composite crew?
  • What is the longest path method used for?
  • Why is it important to align the Work Breakdown Structure (WBS) and Cost Breakdown Structure (CBS)?
  • What is the formula for Cost Performance Index (CPI)?
  • What is the intent of a schedule update?
  • Which method is primarily used to analyze past project performance?
  • Which of the following is a defining trait of non-excusable delays?
  • What is an observational method in forensic scheduling?
  • What defines a Finish-to-Start (FS) relationship?
  • Which MIP is aligned with TIA guidance as per RP 52R-06?
  • Which of the following methods is classified as an observational method?
  • Why is education/skill level relevant in planning?
  • What does a critical path in scheduling indicate?
  • What is the CBS used for?
  • What does contingency refer to in the context of project budgets?
  • What does a scheduling spec typically include?
  • What is a milestone in project management?
  • How are assumptions critical to project scheduling?
  • What constitutes schedule manipulation?
  • What practice best protects against delay disputes?
  • How can schedule changes impact stakeholders?
  • What is a resource histogram?
  • What is a significant risk associated with MIP 3.5?
  • Why are schedule specs critical?
  • What does "input data" mean in planning?
  • When is the Time Impact Analysis (TIA) method best utilized?
  • What is the main purpose of forensic schedule analysis?
  • What is the purpose of a control account in project management?
  • What is a control account in project management?
  • What is a constraint in scheduling?
  • What characterizes a logic-driven schedule?
  • What type of analysis is often the first step in risk management?
  • What does EVM stand for in project management?
  • What does the term "planning hierarchy" refer to?
  • What is a significant risk when using Time Impact Analysis (TIA) retrospectively?
  • Why is float erosion significant in delay analysis?
  • Which method is described by MIP 3.2?
  • What purpose do schedule logs serve in delay analysis?
  • What does MIP 3.4 refer to?
  • What does resource over-allocation refer to?
  • What is the EIA-748 standard primarily concerned with?
  • What is float ownership?
  • Which type of relationship is described as a success where a successor cannot finish until a predecessor starts?
  • What are the primary outputs of schedule maintenance?
  • What is re-baselining in project management?
  • What does "constructability" in schedule modeling refer to?
  • What is meant by scope definition in project management?
  • What does EAC represent in project management?
  • What is the primary function of a lookahead schedule?
  • Why is forensic analysis typically separated from cost impact in project management?
  • What does open-ended logic refer to in project management?
  • What is the purpose of a baseline?
  • What is a planning constraint?
  • Which MIP is most often accepted in disputes for retrospective analysis?
  • What is the significance of schedule transparency?